|
May 11, 2024
|
|
|
|
TECH 4466 - Facility Design (3) (METH) Integrated approach to design and layout for production and distribution facilities with respect to workstation design, material handling, project and resource planning, production control; use of Computer Aided Design, scheduling and analytical software. Team projects, written reports and oral presentations. PREREQUISITE: TECH 3440 , TECH 4460 and TECH 4464 , or permission of instructor.
Add to Portfolio (opens a new window)
|
|